Last Updated: 10.08.2026 17:24:59Filters: 10/06/2026 to 10/08/2026; Include PJM Drill
Emergency Message
102207
Maximum Generation Emergency/Load Management Alert-Capacity Emergency-NERC EEA 1
Alert
10.08.2026 16:00
AEP
A Maximum Generation Emergency/Load Management Alert-Capacity Emergency-NERC EEA 1 has been issued from 08:30 on 10.09.2026 through 15:30 on 10.09.2026 . Maximum Generation Emergency has been called into the operating capacity. Per M-13, Generation Dispatchers should provide PJM with an estimate of the amount of time they need to return to service any generator on a Planned Outage. This 'Early Return Time' should be updated via eDART, and will not affect the Planned Outage estimated end date. Additional Comments: For testing purposes only.
102206
Maximum Generation Emergency/Load Management Alert-Capacity Emergency-NERC EEA 1
Alert
10.07.2026 16:30
10.08.2026 12:26
AEP
A Maximum Generation Emergency/Load Management Alert-Capacity Emergency-NERC EEA 1 has been issued for 10.07.2026 . Maximum Generation Emergency has been called into the operating capacity. Additional Comments: For testing purposes only.